Prepare the Ground Before You Build
Site preparation services for accessory dwelling units in Pownal, Maine.
When you are adding an accessory dwelling unit to an existing property, the site work has to fit around what is already there, including setbacks, utilities, mature trees, and drainage patterns that were not designed for a second structure. In Pownal, where many lots are wooded or sloped, clearing and grading for an ADU often means working in tight spaces without disturbing the main house or septic system. McGovern Earthworks handles excavation, trenching, and drainage coordination tailored to the constraints of smaller building pads and existing site conditions.
Site preparation starts with clearing the footprint, excavating to the depth required for the foundation, and setting final grade so water drains away from both structures. Trenching is routed to connect utilities without crossing septic fields or damaging root systems. The work is sequenced to support construction timelines, so the foundation crew can start as soon as the site is ready. This approach keeps the project moving and prevents delays caused by incomplete grading or drainage issues that show up after framing begins.
If you are planning an ADU in Pownal and need site prep that accounts for existing site features, McGovern Earthworks can review the building plan and coordinate the excavation schedule.
How excavation fits into a tight lot layout
The work begins with clearing trees and vegetation from the building pad, then excavating to the depth specified by the foundation plan. In Pownal, where properties often include ledge or shallow soils, excavation may require additional depth in some areas or the use of smaller equipment to avoid damaging nearby structures or landscaping. Trenches for water, sewer, and electric are dug to code depth and routed to avoid conflicts with existing systems.
Once the excavation is complete, you will see a level building pad with clean edges, trenches that run from the main utilities to the ADU footprint, and graded drainage paths that keep runoff away from both the new and existing structures. The site is ready for foundation work without waiting on backfill or regrading. Builders can move directly into forming and pouring because the elevation and drainage are already set.
McGovern Earthworks coordinates with septic installers, electricians, and plumbers to make sure trenching does not interfere with other trades or require rework. The schedule is built around your construction timeline, and the site is left staged for the next phase. This level of coordination is especially important on lots where space is limited and access routes overlap.
You will likely have questions about the timeline
Homeowners usually want to know how the work affects the main house, how long the site will be torn up, and whether existing utilities need to be relocated.
McGovern Earthworks prepares ADU sites across Pownal with attention to lot constraints, utility coordination, and construction timelines that keep projects moving. If you are adding an accessory dwelling unit and need excavation and grading that fits your property layout, the team can walk the site and explain what the work involves.
Areas We Serve
- Scarborough, ME
- Cape Elizabeth, ME
- Portland, ME
- Falmouth, ME
- Yarmouth, ME
- North Yarmouth, ME
- Freeport, ME
- Brunswick, ME
- New Gloucester, ME
- Gray, ME
- Windham, ME
- Durham, ME
- Westbrook, ME